From July 18 to 20, a review meeting was held in Chibi, Hubei Province on the preliminary design principles of CR Power's Puqi Phase III 1000MW Ultra-supercritical Coal-fired Generating Unit Project ("Phase III Project") was successfully held. Zhang Junzheng, vice chairman of the board of directors, and Bu Xiandou, vice president, of the Company were present at the meeting. Also present were Chen Xinjun, chairman, and Hu Yuqing, vice chairman, of Central Southern China Electric Power Design Institute Co., Ltd. (CSEPDI) of China Power Engineering Consulting Group, as well as relevant personnel from Power China Hubei Electric Engineering Co., Ltd. and State Grid Hubei Electric Power Co., Ltd.