The hoisting of the first wind turbine of CR Power's 1000MW Wind Power Project in Santanghu was successfully completed on October 9. The Project is located in Santanghu Town, Balikun County, Hami City, Xinjiang, with a planned total investment of RMB 5.086 billion and one 250MW/1000MWh energy storage station constructed as the supporting facility. After the Project is completed, the average annual on-grid power generation capacity will be 3.048 billion kWh and the average annual equivalent utilization hours will be 3,074 hours, which can save 919,000 tons of standard coal and reduce 2.5239 million tons of CO2 emission every year.