On May 27, CR Power Suwan New Energy Company achieved the full capacity grid-connected power generation of the Tancheng 100MW Wind Power Project in Mengcheng, Anhui at one time. There are 19 sets of 5.27MW high hybrid towers of wind turbines installed in the project, together with a new 110kV step-up substation and a 50MW/50MWh capacity energy storage system. Upon its production, the project will produce on-grid power of 258 million kWh, save 71,800 tons of standard coal, and reduce 206,400 tons of carbon emissions on an annual basis.